POSITION |
PROJECT NAME AND LOCATION |
EMPLOYER |
PROJECT VALUE IN THOUSANDS OF USD |
CONSTR. PERIOD |
DESCRIPTION OF WORKS
|
1. |
Reconstruction of city roads |
Fond grada Zagreba |
|
|
|
2. |
Reconstruction of Ilica street I |
|
|
1990 |
Works on the reconstruction of the city road |
3. |
Reconstruction of Draškovićeva street |
Fond grada Zagreba |
0,63 |
1994 |
Earthworks (excavation, fills, excavation of installation trenches). Road base (blanket course, cement stabilization, asphalt, reconstruction of sewerage and water systems, gas, electricity and telecommunication installations and other installations).
Pavement works. Other construction works |
4. |
Reconstruction of Šubićeva street |
Fond grada Zagreba |
0,39 |
1994 |
Earthworks (excavation, fills, excavation of installation trenches). Road base (blanket course, cement stabilization layer, asphalt, reconstruction of sewerage and water systems, gas, electricity and telecommunication installations and other installations).
Pavement works. Other construction works |
5. |
Reconstruction of Pantovčak street |
Fond grada Zagreba |
1,01 |
1995 |
Earthworks (excavation, fills, excavation of installation trenches). Road base (blanket course, cement stabilization layer, asphalt, reconstruction of sewerage and water systems, gas, electricity and telecommunication installations and other installations).
Pavement works. Other construction works |
6. |
Reconstruction of Ilica street II |
Fond grada Zagreba |
0,52 |
1995 |
Earthworks (excavation, fills, excavation of installation trenches). Road base (blanket course, cement stabilization layer, asphalt, reconstruction of sewerage and water systems, gas, electricity and telecommunication installations and other installations).
Pavement works. Other construction works. |
7. |
Reconstruction and higher level of maintenance of streets in the city of Sisak |
Grad Sisak, Gradsko
poglavarstvo |
0,55 |
1996 |
Reconstruction works include the works on infrastructure (water, sewage systems and electrical installations), expansion of highways and partial extension, execution of works on precipitation dewatering and execution of all construction works until completion. Reconstruction of the following structures was done: Križanićeva street, sidewalk of the I.R.Siđa street, sidewalk of the Mogorički and Vončinina streets. Main works: excavation of 7.960 m3, fill 420 m3, replacement of soil with stone material, base layer 5.540 m3, asphalt 1.850 t. |
8. |
Reconstruction and higher level of maintenance of streets in the city of Sisak |
Grad Sisak, Gradsko
poglavarstvo |
0,61 |
1995 |
Reconstruction works include the works on infrastructure (water, sewage systems and electrical installations), expansion of highways and partial extension, execution of works on precipitation dewatering and execution of all construction works until completion. Reconstruction of the following structures was done: parking area k.č.604, parking area k.č.
568/1 and 568/2, parking area "Trokuće",
sidewalk "Budaševo" and "Vatrogasni dom". Main works: excavation 9 000 m3, ill 1.510 m3, replacement of soil with stone material, base layer 7.550 m3, asphalt 2.700 t. |
9. |
Reconstruction of Ilica street from
house no. 45 up to the Street of
Republike Austrije in Zagreb |
Fond grada Zagreba |
0,54 |
1995 1996 |
Reconstruction works include the works on infrastructure (water, sewage systems and electrical and gas installations) expansion of highways and partial extension, works on precipitation dewatering and partial execution of all construction works until completion. Reconstruction of the following structures was done: Highways, sewage system, main water supply system, water service connections, temporary water supply pipeline, low pressure gas conduit, gas service connections and average pressure gas conduit. Main chase cutting and demolition works 1.095 m3, excavation works 4.690 m3, fill 1.110 m3, replacement of soil with stone material and base layer 3.737 m3, concrete 691 m3, asphalt 616t. |
10. |
Reconstruction of the square Trg Burze in Zagreb |
Fond grada Zagreba |
0,59 |
1995 |
Reconstruction works include the works on infrastructure (water, sewage systems and electrical and gas installations) expansion of highways and partial extension, works on precipitation dewatering and partial execution of all construction works until completion. Reconstruction of the following structures was done: Highways, sewage system, main water supply system, water service connections, fountain pipeline Main chase cutting and demolition works 170 m3, excavation works 4.236 m3, replacement of soil with stone material and base layer 2.635 m3, concrete 820 m3, asphalt 113t and all works on the construction of fountain, except stone dressing works which the Employer contracted separately |
11. |
Reconstruction of Tkalčićeva street from Splavnica street to Skalinska street up to the Krvavi most street in Zagreb. |
City of Zagreb Gradski ured za izgradnju grada Zagreba |
0,200 |
1998 |
Execution of all eartworks, concreting and asphalt works and the reconstruction of all installations, gas, high and low voltage electrical installations, water and sewage systems with all works for household service connections and adjoining street connections. Works were done in the following adjoining streets: Masarykova street, Preradovićeva street, Varšavska street. |
12. |
Reconstruction of Varšavska street from Gundulićeva street to Frankopanska street. |
City of Zagreb Gradski ured za izgradnju grada Zagreba |
0,260 |
1997 |
Execution of all eartworks, concreting and asphalt works and the reconstruction of all installations, gas, high and low voltage electrical installations, water and sewage systems with all works and household service connections in Varšavska street as well as connections for Frankopanska and Gundulićeva streets. |
|