1) |
Nikola Tesla Hydro Power Plant, Vinodol, Croatia |
Udružena elektroprivreda Hrvatske, Zagreb |
|
1948-1952 |
HPP Nikola Tesla in Vinodol, rated power 110 MW, Lokvarka earth dam, height 70 m, 800,000 m3 of material placed, Bajer concrete dam 60 m high, headwater channel and diversion tunnel 14 km of total length, cross-section 7 m2, switchyard, storage reservoir of 32 million cu.m. |
2) |
Ozalj Hydro Power Plant, Ozalj, Croatia |
Udružena elektroprivreda Hrvatske, Zagreb |
|
1949-1951 |
HPP Ozalj on the Kupa River, rated power 3.6 MW, dam installations on the river, dam and engine room construction |
3) |
Zavrelje Hydro Power Plant, Dubrovnik, Croatia |
Udružena elektroprivreda Hrvatske, Zagreb |
|
1949-1952 |
HPP Zavrelje near Dubrovnik, rated power 3.6 MW, reinforced concrete canal, engine room and dam. |
4) |
Gojak Hydro Power Plant, Ogulin, Croatia |
Udružena elektroprivreda Hrvatske, Zagreb |
|
1954-1959 |
HPP Gojak near Ogulin, rated power 48 MW, earth and concrete dam, headwater channel 9.4 km long, clearance 4.5 m, relief well, engine room. |
5) |
Split Hydro Power Plant, Split, Croatia |
Dalmatinske hidroelektrane, Split |
|
1958-1962 |
HPP Split, rated power 240 MW, storage reservoir and Prančevići concrete dam on the Cetina River, height 35 m, headwater channels 9.6 km long, clearance 6.1 m, ducts, water intake and installations. |
6) |
Senj Hydro Power Plant, Senj, Croatia |
Zajednica elektroprivrednih poduzeća Hrvatske, Hidroelektrana Senj |
|
1961-1965 |
HPP Senj, rated power 216 MW, storage reservoir, Sklope earth embankment 74 m high, concrete overflow dam Gusić Polje, embankments, water intake, headwater channels 22.7 km long, cross-section 20 m2, main plant. |
7) |
Rijeka Hydro Power Plant, Rijeka, Croatia |
Udružena elektroprivreda Hrvatske, Zagreb |
|
1964-1968 |
HPP Rijeka, rated power 41 MW, gravity concrete dam, tunnel inclined ducts, underground engine room and access tunnel. |
8) |
Sklope Hydro Power Plant, Lika, Croatia |
Združeno poduzueće elektroprivrednih organizacija, Rijeka |
|
1968-1970 |
HPP Sklope, rated power 25 MW, Kruščica storage reservoir, Sklope earth dam 77 m high, headwater channel, water intake. |
9) |
Orlovac Hydro Power Plant, Split, Croatia |
Elektroprivreda Dalmacije, Split |
|
1968-1973 |
HPP Orlovac, rated power 249 MW, Lipa storage reservoir, headwater channel 12 km long, clearance 5.5 m, supply channels in Livanjsko Polje. |
10) |
Varaždin Hydro Power Plant, (Central Drava 3), Croatia |
Elektroprivreda, Zagreb |
43 |
1971-1974 |
HPP Varaždin, rated power 86 MW, storage reservoir, dam, diversion canals, engine room.
Total excavation : 6.2 mil. m2, |
|
|
|
|
|
embankments 3.5 mil. m3, |
|
|
|
|
|
concrete 100,000 m3, |
|
|
|
|
|
asphalt 615,000 m2. |
11) |
Ormož Hydro Power Plant (Central Drava 2), Slovenia |
Dravske elektrane, Maribor |
12400 |
1975-1978 |
HPP Ormož, rated power 111 MW, excavation for engine room, headwater and discharge canals 4.5 km of length, asphalting of headwater channel slopes. |
12) |
Čakovec Hydro Power Plant (Central Drava 4), Croatia |
Elektroprivreda-Zagreb |
63360 |
1975-1981 |
HPP Čakovec, rated power 77.6 MW, storage reservoir, dam, diversion channels, engine room. Total excavation 5.6 mil. m3, |
|
|
|
|
|
embankments 4.3 mil. m3, |
|
|
|
|
|
concrete 109,000 m3, asphalt |
|
|
|
|
|
403,000 m2. |
13) |
Obrovac Reversible Hydro Power Plant Obrovac, Croatia |
Elektroprivreda Dalmacije, Split |
17500 |
1978-1983 |
Reversible HPP Obrovac, rated power 310 MW, supply installations, headwater channel 8.1 km long, clearance 5.2 m, gate chamber, relief well, penstock. |
14) |
Dubrava Hydro Power Plant (Central Drava 5), Croatia |
Elektroprivreda Zagreb |
30490 |
1985-1988 |
HPP Dubrava, rated power 75 MW, concrete gravity dam with four discharge fields. Dam length 112 m, 54,000 m3 of concrete poured in concrete part. The filled part 300 m long. Dam height 23.5 m. Diversion channel (supply 2 km, discharge 4.8 km) is separated by the engine room. A multipurpose plant (energy, flood prevention, water supply, recreation and drainage of surplus flood water). Storage reservoir with embankments along the dam create a lake of 16.6 m2 area Embankments 22.5 km of length. |
|