POSITION |
PROJECT NAME AND LOCATION |
EMPLOYER |
PROJECT VALUE IN THOUSANDS OF USD |
CONSTR. PERIOD |
DESCRIPTION OF WORKS
|
1)
|
Zavrelje Hydro Power Plant, Dubrovnik, Croatia |
Udružena elektroprivreda Hrvatske, Zagreb |
|
1949-1952 |
HPP Zavrelje near Dubrovnik, rated power 3.6 MW, reinforced concrete channel, engine room and dam. |
2)
|
Gojak Hydro Power Plant, Ogulin, Croatia |
Udružena elektroprivreda Hrvatske, Zagreb |
|
1954-1959 |
HPP Gojak near Ogulin, rated power 48 MW; earth and concrete dam, head race length 9.4 km and 4.5 m of clearance, relief well, engine room. |
3) |
Sklope Hydro Power Plant, Lika, Croatia |
Združeno poduzeće elektroprivrednih organizacija, Rijeka |
|
1968-1970 |
HPP Sklope of 25 MVA rated power, the Kruščica reservoir, the Sklope earthfill dam 77 m high, head race, water intake. |
4)
|
Orlovac Hydro Power Plant, Split, Croatia |
Elektroprivreda Dalmacije, Split |
|
1968-1973 |
HPP Orlovac of 249 MW rated power, the Lipa reservoir, head race 12 km long and 5.5 m of clearance, supply channels at Livanjsko polje. |
5)
|
Kupa-Kupa Canal, Croatia |
Direkcija za Savu, Zagreb and Karlovac |
|
1970-1972 |
Earthwork, canal excavation, levelling, filling, embankment slope landscaping. |
6)
|
Varaždin Hydro Power Plant (Central Drava 3), Croatia |
Elektroprivreda, Zagreb |
4281 |
1971-1974 |
HPP Varaždin of 86 MW rated power, reservoir, dam, diversion channels, engine room. Total excavation 6.2 mil.cu.m, fills 3.5 mil. cu.m, concrete 100,000 cu.m, asphalt 615,000 sq.m. |
|
Letaj Irrigation and Dam, Istria, Croatia |
Opće vodoprivredno poduzeće, Rijeka |
|
1973-1974 |
A dam at the location of Letaj creating a reservoir of 85 ha area; designed for irrigation of agricultural areas. The dam is an arched dam with a pronounced fall on the downstream side, 35 m high and 90 m long. |
8)
|
Mirna River Regulation Works |
Opće vodoprivredno poduzeće, Rijeka |
|
1971-1974 |
Relocation of the Mirna River channel along the roads of Istarske Toplice-Ponte Portone 7 km long. Excavation of a new River channel, construction of embankments, a new road, backfilling of the old River channel, stone slab pitching of the new River channel, improvement of an existing slide. |
9)
|
Čakovec Hydro Power Plant (Central Drava 4) |
Elektroprivreda, Zagreb |
6336 |
1975-1981 |
HPP Čakovec of 77.6 MW rated power; reservoir, dam, diversion channels, engine room.
Total excavation 5.6 mil.cu.m, embankments 4.3 mil.cu.m, concrete 109,000 cu.m, asphalt 403,000 sq.m. |
10)
|
Ormož Hydro Power Plant (Central Drava 2) |
Dravske elektrane, Maribor |
1240 |
1975-1978 |
HPP Ormož of 111 MW rated power; engine room excavation, headrace and discharge channels 4.5 km long, headrace slopes asphalting. |
11)
|
Obrovac Hydro Power Plant, Obrovac, Croatia |
Elektroprivreda Dalmacije, Split |
1750 |
1978-1983 |
Reversible Hydro power plant Obrovac of 310 MVA rated power, supply installations, headrace 8.1 km long and 5.2 m of clearance, gate chamber, water chamber, penstock. |
12)
|
Sidi Yacoub Dam, Algeria |
Ministere de l' Hydraulique de l' Algerie |
12400 |
1981-1985 |
Earth dam construction in the Ardjem River canyon. The irrigation complex consisting of a reservoir of the volume 280,000,000 cu.m. The Ardjem River diversion was solved by a tunnel 444 m long and 8 m of clearance and a bottom outlet of a 2.5 m clearance. The water intake with the bottom outlet intake structure and the control building are located at the dam slope. The spillway system is of a well type consisting of a vertical shaft, a tunnel of 10 m clearance, a chute and a ski jump. The dam height is 95 m.
The main work quantities : |
|
|
|
|
|
. open excavation: 540,000 cu.m |
|
|
|
|
|
. tunnel excavation: 94,000 cu.m |
|
|
|
|
|
. placed into the dam body in total : 3,690,000 cu.m |
|
|
|
|
|
. concrete : 76,000 cu.m |
13)
|
Črnec Polje Regulation Works |
Opće vodoprivredno poduzeće - OOUR Vodoprivreda, Sisak, Croatia |
|
1983-1984 |
The irrigation system consisting of main canals 51 km of length, 3 pump stations and other associate structures. Earthworks for levelling and land parcel development. |
|
|
|
|
|
Excavation : 1,150,000 cu.m |
|
|
|
|
|
Fill : 645,000 cu.m |
|
|
|
|
|
Concrete : 22,000 cu.m |
14)
|
The Mina Area Irrigation System Development, Algeria |
Ministere de l' Hydraulique, Direction de l' - Hydraulique de la Willaya de Relizane |
5000 |
1984-1989 |
The irrigation system near the place of Relizane. Main intake structure, a rectangular canal 4.4 km in length; a tunnel 1.1 km long and 3.2 m of clearance. |
|
|
|
|
|
Excavation : 550,000 cu.m |
|
|
|
|
|
Embankment : 250,000 cu.m |
|
|
|
|
|
Concrete : 39,000 cu.m |
|
|
|
|
|
Reinforcement: 1,100 cu.m |
15)
|
Chiffa & Harbil Hydraulic Projects, Medea, Algeria |
Ministere de l' Hydraulique et de l' Environement et des Forets. Direction generale des infrastructures hydraulique, Willlaya Medea, Algerie |
8540 |
1984-1989 |
Two water tunnels in total length of 17 km, cross section 7.5 sq.m, the diversion of Chiffa and Harbil rivers with supply and discharge facilities. |
16)
|
Dubrava Hydro Power Plant (Central Drava5), Croatia |
Electric Power Supply Zagreb |
3049 |
1985-1988 |
The Dubrava Hydro power of 75 MW rated power. A concrete gravity dam with four discharge fields. Dam length 112 m; in concrete portion 54,000 cu.m placed. A filled part 300 m in length. Dam height 23.5 m. The diversion channel (the headwater channel of 2 km, the spillway channel 4.8 km) is divided by the engine room. The plant is designed as a multipurpose structure (energy supply, flood control, water supply, recreation purposes and drainage of surplus flood water). The reservoir with the embankments near the dam makes a lake of 16.6 sq.km surface.
Embankments length 22.5 km. |