1) |
Medvednica Tunnel, Zagreb. Croatia |
Ministarstvo građevinarstva NRH |
5500 |
1947 |
A road tunnel 250 m of length, 60 sq.m in cross-section, full profile excavations |
2) |
Zrinšćak I & II Tunnels, Istria, Croatia |
Učka, Pazin |
8400 |
1972-1976 |
Road tunnels of 300 m in length, cross-section 70 sq.m, tunnel driving executed by NATM |
3) |
Kominske Bare Tunnel, Serbia |
Srbija put-Združeno poduzeće Srbija, Belgrade |
5300 |
1973-1975 |
A road tunnel 220 m long, 80 sq. m in cross-section. Tunnel driving executed by NATM |
4) |
Učka Tunnel, Istria, Croatia |
Učka, Pazin |
38970 |
1976-1981 |
A road tunnel of 5.1 km in length, 70 sq.m cross-section, preliminary work, access roads of 24 km, |
5) |
Čabar I Tunnel, Čabar, Croatia |
SIZ za ceste SRH |
6000 |
1978-1980 |
A road tunnel 148 m long, 90 sq. m in cross-section, driving of the tunnel executed by NATM |
6) |
Banska Vrata Tunnel, Rijeka Croatia |
SIZ za ceste SRH, Zagreb |
1700 |
1978-1980 |
A road tunnel 148 m long, cross-section 90 sq.m, driving of the tunnel executed by NATM |
7) |
Rijeka Bypass Tunnels, Rijeka, Croatia |
SIZ za ceste SRH,
Zagreb |
40000 |
1979-1983 |
Four road tunnels of total length 2175 m, cross-section 70 sq.m, full profile excavation,
driving executed by NATM. Trsat Tunnel: 800 m in length, Katarina Tunnel: 419 m long
(220 m excavated by means of a heading due to small cover. Škurinje I Tunnel 396 m long,
Škurinje II Tunnel 560 m long |
8) |
Zagreb-Split Semi-motorway, Tiškovac and Carigrad Tunnels, Croatia |
SIZ za ceste SRH,
Zagreb |
10000 |
1980
under constr. |
Road tunnels in total length of 600 m, cross-section 70 sq.m, driving executed by NATM |
9) |
Road tunnels on the road
RN 1 La Chiffa-Berrouaghia,
Algeria |
Ministere des Travaux
Publics, Algerie |
10000 |
1982-1983 |
Road tunnel no. 1 in the length of 215 m, cross-section 65 sq.m and no. 1 in the length of 410 m, cross-section 65 sq.m, driven by NATM |
10) |
Turija Tunnel, Vrgorac, Croatia |
Regionalni SIZ za ceste, Split |
3000 |
1982-1985 |
A road tunnel 300 m long, cross-section 60 sq.m, full profile excavation |
11) |
Hrasten Tunnel, Croatia |
Hrvatske ceste |
3370 |
1992-1994 |
A road tunnel on Zagreb-Karlovac Motorway 280 m long, cross-section 70 sq.m, driven by NATM |
12) |
Tuhobić Tunnel, Croatia |
Hrvatske ceste |
15970 |
1991-1994 |
A road tunnel on Zagreb-Karlovac Motorway, length 2106 m, cross-section 70 sq.m, driven in two stages by NATM |
13) |
Sopač Tunnel, Croatia |
Hrvatske ceste |
8040 |
1993-1995 |
A road tunnel on Zagreb-Karlovac Motorway 740 m long, cross-section 70 sq.m, driven in two stages by NATM |
14) |
Sveti Rok Tunnel, Croatia |
Hrvatske ceste |
44432 |
1995- |
A road tunnel on Zagreb-Split Motorway, cross-section 75 sq.m, length 5600 m, will be driven in two stages by NATM |
15) |
Tunnels: Javorova Kosa, Podvugleš, Veliki Gložac |
Autocesta zagreb-Rijeka, Zagreb, Croatia |
7848 |
1999- |
Javorova Kosa tunnel: A road tunnel on Zagreb-Rijeka motorway, length 1407 m, cross-section 86-120 sqm, driven by NATM and PIPE ROOF (86 m) |
|
|
|
|
|
Podvugleš tunnel: A road tunnel on Zagreb-Rijeka motorway, length 631 m, cross-section 86-120 sqm, driven by NATM and PIPE ROOF (46 m) |
|
|
|
|
|
Veliki Gložac tunnel: A road tunnel on Zagreb-Rijeka motorway, length 1150 m, cross-section 107-128 sqm |