POSITION |
PROJECT NAME AND LOCATION |
EMPLOYER |
PROJECT VALUE IN THOUSANDS OF USD |
CONSTR. PERIOD |
DESCRIPTION OF WORKS
|
1) |
Water Treatment Plant in Haminkeln, FR Germany |
W. Strauss Nachf., Lingen |
|
1979-1981 |
Complete construction works for the water treatment plant. |
2) |
Water Treatment Plant in Rodtmullenbach and Lohomar, FR Germany |
W. Strauss Nachf. |
|
1979-1981 |
Complete construction works for the water treatment plant. |
3) |
Tunnel Učka Waterworks Opatija, Croatia |
SIZ za stambene i komunalne poslove općine Opatija |
|
1982-1983 |
Connecting pipeline, reservoir, water supply structures in tunnel water distribution system, pump station, conveying lines, lock chambers, access roads. |
4) |
Regional Waterworks of Northern Dalmatia, Croatia |
Poduzeće za izgradnju regionalnog vodovoda sjeverne Dalmacije, Zadar |
3800 |
1983-1985 |
Complete construction works, laying of water pipelines, manhole construction, road surface development, sludge discharge structure. |
5) |
Regional Waterworks of Petrinja - Sisak, Croatia |
SIZ komunalnih djelatnosti, Sisak |
4000 |
1982-1984 |
A regional waterworks for 200,000 inhabitants, main line of 20 km in length, water intake, water treatment plant, pumping station, 4 reservoirs. |
|
|
|
|
|
Excavation : 716,000 m3 |
|
|
|
|
|
Embankment: 204,000 m3 |
|
|
|
|
|
Concrete : 38,000 m3 |
6) |
Water Supply System of Isser Keddara, Boudouau Algiers, Algeria |
Ministere de l' hydraulique de l' environment et des forets D.G.I.H. Alger, Algeria |
389500 |
1985-1989 |
The water supply system of the city of Algiers. The system consists of the main pipeline of 70 km in length made of concrete pipes dia. 1,500 and 2,000 mm, steel piping dia. 2.000 mm, city network 100 km long, a tunnel of 1,500 m in length, water treatment plant, 220 discharge or air chambers. The factory for prestressed concrete pipes was constructed for the purpose. |
|
|
|
|
|
Excavation : 2,000,000 m3 |
|
|
|
|
|
Concrete : 100,000 m3 |
7) |
Regional Waterworks of Central Dalmatia, Croatia |
Poduzeće za izgradnju regionalnog vodovoda Srednje Dalmacije |
3610 |
1985-1987 |
Complete construction works, laying of pipelines, manhole construction, road surface development, sludge discharge structure, pipe dia. 100-300 mm, excavation in soil of category IV and V.. |
8) |
NOVALJA-LUN Main Pipeline (Island of Pag), Croatia |
Hrvatske vode, Zagreb |
1050 |
1996 |
The main line of a length L=11.73 km, modular cast pressure pipes dia. 200 and 150 mm, water storages of Gager(200 m3) and Lun (200 m3) and a stop chamber (50 m3). |
9) |
Regional Water system Gorski Kotar (I phase) |
Hrvatske vode Zagreb |
124 |
1996-1998 |
a- Gravity water system Section: Vrata-Delnice l = 4000 m
b- Gravity water system Section: Račva-Fužine III l 1000 m |
|
|
|
|
|
Cast iron pipes (16 bar), dia. 300, 200, 100 and 80 mm. |